The first phase of the construction of a swimming pool begins with the excavation of the pool shell. The excavation should be at least 3 feet (91.4 cm) outside the actual pool’s dimensions. This will allow for working space around the pool. To mark the excavation area, use 2 x 3 in (5.1 x 7.6 cm) stakes with sharp ends. Next, use a second set of stakes to outline an area six feet (1.8 m) larger than the pool.
The walls and base of a swimming pool are made from steel-reinforced concrete. This material is porous and durable and allows for the plaster-coated shell to hold water. Concrete pools are typically durable and long-lasting. A swimming pool shell that is made of concrete is also easily repairable and can be painted and replastered. The steel shell will last for many years because concrete can be shaped to fit almost any shape or style.
Next, the pool’s base is prepared. This includes excavating the soil to make the bottom face uniform and flat. Loose soils are filled with a firm base and a small layer of concrete is poured on top of this. Once this layer is installed, a steel rod is driven through the bottom hole to support the concrete. Adding further panels will increase the thickness of the wall. The bottom panel is typically 5 cm thick.
The construction of a swimming pool involves several stages. First, the contractor will draw up the plans and apply for permits from the local permit office. This phase is usually slow because there are unknown utility lines underneath the surface of the ground. Next, the contractor will level the ground. Once this is complete, the contractor will install the pool’s plumbing and coping. At this point, it is time to add any water features. A simple installation usually takes two days, whereas a complex one may take up to five or seven.
Once the foundation is complete, the interior of the swimming pool will be finished. After this, you can apply a finish to the entire pool. The finish should be applied with care so that it can last for many years. Once it is finished, the pool will be filled with water. Double-check the plumbing and mechanical systems before filling it with water. If you are building a custom swimming pool, consider adding water features such as waterfalls.
A swimming pool is a significant investment, and it will require heavy-duty equipment and specialized expertise to construct and maintain. While a pool can be a do-it-yourself project with the right tools, hiring a professional is a smart decision. Besides, you will avoid the stress of dealing with permits, the right materials, and other issues. As a result, your project will be easier and more enjoyable.
The shape of a swimming pool is determined by a number of factors, including the size, position, and shape. Your contractor will come up with a rough estimate and let you make modifications. You can sign the contract once you are satisfied with the project. Depending on the shape of the pool, it could be any color or shape. In some cases, the contractor will suggest different shapes or sizes to fit the property’s layout.